top of page

Mr. Wanlop Rungsa

 

( Managing Directer )

 

E-mail: rachataengineering@gmail.com

Office Phone : +66(02) - 920 - 9815
Mobile Phone : +66(089) - 285 - 4928

Professional info

 

Date of Birth                                                                      July  8 , 1970.

Nationality                                                                         Thai

Education                                                                          King Mongkut’s Institute of Technology Thonburi                         

Field  of  Study                                                                  Production Engineer  
Qualification                                                                      Engineering  License  NO : ภอ 12888

Overseas  Experience                                                       Inspection  Work  in  JAPAN

Languages

 

- Thai
- English

 
Work experience

 

RACHATA ENGINEERING & SUPPLIES CO.,LTD.  ( 2006 - present )

 

2010 - PROJECT ENGINEER
 

            ENGINEERING & CONSTRUCTION WORK FOR STEEL STRUCTURE 500 TONS

                        - Shop drawing , Fabrication & Erection work

 

            ENGINEERING SERVICE FOR 4 STORAGE TANK OF ETERNAL PROJECT      

                        - Strength calculation , shop drawing

 

            ENGINEERING SERVICE FOR 350 M2 POWDER SILO MODIFICATION  2 ITEM PROJECT

                        - Site survey , Basic design , strength calculation , shop drawing 

 

2009 - PROJECT ENGINEER

  

            ENGINEERING SERVICE  FOR 400 M3 B-100 STORAGE TANK OF ESSO EXPANSION PROJECT

                        - Site survey , basic design, strength calculation, shop drawing for tank & foundation

 

            ENGINEERING SERVICE  FOR PIPE SUPPORT OF  PTTPL PROJECT

                        - Site survey , structure analysis and design for 5 type pipe support.

 

            ENGINEERING SERVICE FOR SKID TANK 3 ITEM FOR LLK ETHANOL PROJECT

                        - Arrangement shop drawing & strength calculation & site survey.

           

            ENGINEERING SERVICE FOR ESSO PROJECT

                        - Provide piping stress analysis of 4 NGV pipe line 

 

2008 - PROJECT MANAGER


            CHANGING PIPING FOR R-200  REACTOR PROJECT          

                        - Engineering work Material procurement, Erection piping work  & testing of   3000 DB

           
            SUPPLY CARBON STEEL TANK  2 UNIT

                        - Engineering work , Material procurement, Fabrication , Hydrostatic Testing  

 

            ENGINEERING SERVICE FOR PIPING WORK OF IRPC EXPENSION PROJECT

                        - Site survey , Plot plan drawing ,general arrangement drawing , Isometric drawing for  piping work

           

            ENGINEERING SERVICE FOR BANGCHAK EXPENSION PROJECT

                        - Site survey , Arrangement of Plot plan drawing & Isometric drawing

           

            ENGINEERING SERVICE FOR NORTH BANGKOK COMPLINED CYCLE POWER PLANT PROJECT

                        - Arrangement of Shop drawing and  engineering document for tank 3 item

 

            ENGINEERING SERVICE FOR SIGNHA BREVERAGE PLANT PROJECT

                        - Strength calculation , Arrangement of Shop drawing for pressure vessel 9 item

 

            ENGINEERING SERVICE FOR THAPPLINE EXPENSION PROJECT

                        - Hydraulic calculation of piping , calculation of foundation, Arrangement of route line  drawing, arrangement General piping drawing , Isometric drawing
                           & pipe support drawing

 

2007- PROJECT MANAGER
 

            SCAFFOLDING FOR BRIDGE

                        - Steel structure  100 tons

                        - Strength calculation, Fabrication drawing ,local procurement ,

                        - Fabrication & Installation work
 

            PLATFORM AND HANDRAIL FOR CONTINEUS PRESS MACHINE

                        - Steel structure 60 tons

                        - Fabrication & Installation work
 

            ENGINEERING SERVICE FOR 600 M³ &  1200 M³ STORAGE TANK
                        - Strength calculation , assembly drawing and detail drawing  of tank 3 item
 

            CHANGING PIPING FOR REACTOR PROJECT          

                        - Material procurement, Erection piping work  & Testing  of 2000  DB

           
            PIPING OF STEAM LINE  FOR BOILER 1 UNIT

                        - Material procurement, Erection piping work ,Testing and Insulation work 

           

            SUPPLY CARBON STEEL TANK  3 UNIT

                        - Engineering work , Material procurement, Fabrication , Hydrostatic Testing  

 

2006 - STEEL STRUCTURE MANAGER / Second Mekong International bridge project (Package 3)

                        - Steel structure  750 tons

                        - Arrangement of fabrication drawing , Engineering document, Fabrication work,

                        - Installation work control 

 
 
MES MITR PROJECT SERVICE CO.,LTD. ( 1994 - 2005 )

 

2005 - PROJECT MANAGER / MTA-7 PROJECT
                        - Vessel & Non-vessel ,PVC, FRP, Rubber lining equipment of 30 item and  piping work

                        - Strength Calculation, Arrangement of Fabrication Drawing, Pump specification and procured ,Local and Oversea Procurement, Fabrication Work Control.

 

2005 - PROJECT MANAGER / NSO6SPS PROJECT

                        - Vessel & Non-vessel 70 item (import to Singapore)

                        - Strength Calculation, Arrangement of Fabrication Drawing, Local and Oversea

                        - Procurement, Fabrication Work Control.

 

2004 - PROJECT MANAGER / SMPC3 PROJECT

                        - Vessel 100 item, hopper 10 item , tank 8 item, Equipment Platform & Miscellaneous Piping.

                        - Strength  Calculation, Arrangement  of Fabrication  Drawing, Local  and    Oversea  Procurement, Fabrication  Work  Control


            PROJECT MANAGER / KAO-T PROJECT.

                        - Non-pressure Vessel & Tank 63 items.

                        - Strength Calculation , Shop drawing , material Procurement , Fabrication work control.

 

2003 - PROJECT MANAGER / GRAND SIAM PROJECT.

                        - Cooling Tower system 1 unit.

                        - Flow Calculation , Piping arrangement drawing,  to arranged Cooling tower specification & Pump specification and procured , pipe support drawing and
                          Electrical  work.

 

            PROJECT MANAGER / 2 nd EPP PROJECT (EXPORT TO TURKEY)

                        - Pressure Vessel 5 item ( Clad Material ) and 1 Stabilizer  Hopper (include  Agitator)

                        - Strength Calculation, Fabrication drawing, Local & Oversea material

                        - Procurement , Fabrication work control.
 

2002 - PROJECT ENGINEER / S1 PROJECT

                        - Pressure Vessel & Non pressure 90 item , tank 5 item ,Silo 6 item , PVC Equipment and Platform & steel Structure.

                        - Strength Calculation , Fabrication drawing , Local & Oversea material Procurement , Fabrication work control.

 

2001 - PROJECT  MANAGER / SMPC2 PROJECT

                        - Vessel 50 item, hopper ,tank ,Platform & Miscellaneous Piping.

                        - Strength  Calculation, Arrangement  of Fabrication  Drawing, Local  and    Oversea  Procurement, Fabrication  Work  Control

 

            PROJECT  MANAGER /  WASTE HEAT BOILRE PROJECT

                        - Waste Heat Boiler 1 item

                        - Strength  Calculation of Waste Heat Boiler , Arrangement  of Fabrication  Drawing

 

2000 - PROJECT  MANAGER / PCC EXPENSION PROJECT

                        - Silo, Hopper, Tank, Piping and Steel Structure.

                        - Strength  Calculation, Arrangement  of Fabrication  Drawing, Local  and    Oversea  Procurement, Construction  Work  Control

 

            PROJECT  MANAGER / TGCI PROJECT

                        - Tank, Piping ,Instrument & Electrical

                        - Strength  Calculation of tank, Arrangement  of Fabrication  Drawing, Local  and  Oversea  Procurement, Fabrication  Work  Control

 

1999 - PROJECT  ENGINEER/ TNW  PROJECT

                        - Arrangement  of Fabrication  Drawing  for Sedimentation  Tank  with  Agitator 2 sets

                        - Arrangement  of  Piping  Design  drawing

 

1998 - PROJECT ENGINEER/ TPX  PROJECT

                        - Sluice Gate and Screen 2  sets

                        - Arrangement  of Fabrication  Drawing, Local  and  Oversea  Procurement, Inspection  for Sluice  Gate Fabrication  at the Fabricator  Shop  in  Japan

 

            PROJECT  MANAGER / TUBAN PROJECT

                        - Stabilizer  Hopper

                        - Strength  Calculation, Arrangement of Fabrication  Drawing, Local  and  Oversea  Procurement, Fabrication Work Control


1997 -  PROJECT  MANAGER / UENO PROJECT(MODIFICATION  WORK)

                        - Agitator  Vessel  2  sets

                        - Arrangement  of Fabrication  Drawing, Procurement, Fabrication  Work  Control and  Field  Installation  and  Test  Running

 

            PROJECT ENGINEER/ LOBP  PROJECT

                        - Drum  and  Tank  27  sets

                        - Arrangement  of Fabrication  Drawing
 

            PROJECT ENGINEER/ BCP-HDS  PROJECT

                        - Pressure  Vessel  31  items ,Strength  Calculation  for  Pressure  Vessel

 

1996 - PROJECT ENGINEER/ THCX -2 PROJECT

                        - Sluice  Gate  3  sets

                        - Strength  Calculation, Arrangement  of Fabrication  Drawing ,Local  and

                        - Oversea  Procurement  and Fabrication work  Control

 

1995 - SITE ENGINEER/ UENO CAPACITY-UP PROJECT

                        - Equipment  and  piping

                        - Arrangement  of Fabrication  Drawing   For  Vessel

                        - Arrangement  of  piping Drawing   For Control Piping  Work

 

1994 - PROJECT ENGINEER/ STAR  REFINERY PROJECT

                        - Sluice  Gate  3  sets

                        - Strength Calculation, Arrangement  of Fabrication  Drawing ,Local  and

                        - Oversea Procurement

Skills

 

- Auto-Cad R2008
- Microsoft Office , Excel and Word.
- Auto Pipe (FEA)
- Plant Flow program

- Compress program for pressure vessel

Training

 

1. Auto Pipe (Strength calculation software)                    Company Training
2. ISO 9001 Quality System                                              Company Training

3. Inspection Work in Japan

 
 