top of page

WORK EXECUTION 2016 /2

 

Project : Fire Pipe Line for Cooling Tower.
Location : BANGPA-IN COGENERATION LTD.
Period : October 2016 - November 2016

 

 

SCOPE DESCRIPTIONS  OF WORK : 
 

- Installation of Hot Dipped Galvanize 8" pipe for fire pipe line and fire hose cabinet. 
- Piping Installation, Piping / Iso metric drawing and Pipe Support.

 

bottom of page