WORK EXECUTION 2013 - 2014



 
Project : Construction of Softenner Water Tank and Fire Protection System.
Period : August 2013 - August 2014


 

 

SCOPE DESCRIPTIONS  OF WORK : 
 

- Strength Calculation, Shop drawing, Fabrication & Inspection work of Stainless steel 316L tank.
 

- Fire Pump Installation, Fire Protection Pipe line and sprinkler line installation. 

- Piping Installation, Piping / Iso metric drawing and Pipe Support.