top of page

WORK EXECUTION 2015



 
Project : Construction of Water storage tank and Sand filter system.
Location : Chiangmai Beverage Co,Ltd.
Period : August 2014 - Febuary 2015


 

 

SCOPE DESCRIPTIONS  OF WORK : 
 

- Strength Calculation, Shop drawing, Fabrication & Inspection work of Stainless steel tank. 
- Piping Installation, Piping / Iso metric drawing and Pipe Support.

 

bottom of page