SCOPE DESCRIPTIONS

 

Engineering work, Piping stress analysis for thermal stress, Restraint reaction for LPG pipe line.

 

 

 

 

PROJECT / OWNER

 

 

LPG Pipe line  project
 

Owner : Terminal Engineering Solution Co., ltd.

WORK EXECUTION 2009



 
DURING WORK TIME

 

 

As of Februry 2009

DURING WORK TIME

 

 

As of June 2009

PROJECT / OWNER

 

 

Elutriator support  project
 

Owner : Sutee group Co., ltd.

SCOPE DESCRIPTIONS


 

Engineering work, Structure & pipe support analysis. 

 

 

 

 

DURING WORK TIME

 

 

As of July 2009

PROJECT / OWNER

 

 

Heat exchanger project

Owner : Union  construction Co., ltd.

SCOPE DESCRIPTIONS


 

Engineering work, Basic design, Strength calculation and Arrangement of shop drawing. 

 

 

 

 